Connectivity in Gloucester
DistrictThe north east of the South West. 138,565 people in 41 square kilometres.
4 layers about connectivity for Gloucester, each at the level its publisher released it, with its own date and source.
Gigabit coverage by output area
Connected Nations (Ofcom) · January 2026
Gloucester’s 425 output areas range from 0.0% to 100.0%.
Gigabit broadband coverage
CouncilIn Gloucester, 94.8% of homes and businesses could get gigabit-capable broadband in January 2026.
For the UK as a whole, the figure was 87.8%.
- Against England
- 7% higher88.4%
- Against the UK
- 8% higher87.8%
Full-fibre broadband coverage
CouncilIn Gloucester, 77.7% of homes and businesses could get full-fibre broadband in January 2026.
For the UK as a whole, the figure was 81.0%.
- Against England
- 4% lower81.3%
- Against the UK
- 4% lower81.0%
Full-fibre take-up
CouncilIn Gloucester, 25% of the homes and businesses that could get full fibre had a full-fibre connection in January 2026.
For the UK as a whole, the figure was 47%.
- Against England
- 46% lower46%
- Against the UK
- 47% lower47%
4G coverage from all four networks
CouncilIn Gloucester, 100.00% of homes and businesses had outdoor 4G coverage from all four mobile networks in January 2026.
For the UK as a whole, the figure was 99.22%.
- Against England
- 1% higher99.35%
- Against the UK
- 1% higher99.22%